Residential
Residential tower BOQ in 10 days
Full BOQ for a 28-storey London residential scheme under a compressed tender programme.
- Sector
- Residential
- Service
- Cost Planning
- Turnaround
- 10 working days
The challenge
A Tier 1 contractor needed a complete BOQ for a 28-storey residential tower with a fixed tender date. Drawings arrived late and in multiple revisions.
We stood up a dedicated measurement cell, locked NRM2 rules with the client QS, and delivered trade packages in waves so pricing could start before the final package landed.
The bid went in on time with a clear clarification log — and the same structure was reused for post-tender variations.
- Residential
- Cost Planning
- BOQ
They locked NRM rules with our QS team and still hit the tender date — we priced packages as they landed.
James Whitfield
Chief Estimator, Tier 1 Contractor
Project Results
- Turnaround
- 10 working days
- Storeys
- 28
- Outcome
- On-time bid