Secondary school Stage 3 cost plan

Public Sector

Secondary school Stage 3 cost plan

Elemental cost plan for a DfE-aligned secondary school expansion.

Sector
Public Sector
Service
Cost Planning
Stage
RIBA 3

The challenge

The design team needed a Stage 3 cost plan that could survive governance review and still support value-engineering workshops.

We produced an elemental plan with explicit assumptions, risk allowances, and two façade options costed side-by-side for the project board.

  • Education
  • Cost Planning
  • Public Sector

Project Results

Stage
RIBA 3
Options
2 façades
Audience
Project board

Next project

Public Sector
Remeasure and valuation support for a healthcare wing mid-construction.

Related case studies

Public Sector
Remeasure and valuation support for a healthcare wing mid-construction.
Industrial
Option studies that cut £1.8m from a Midlands logistics hub without losing programme.

Ready for a clearer tender pack?

Tell us about your project — we typically respond within one working day.