Secondary school Stage 3 cost plan
Elemental cost plan for a DfE-aligned secondary school expansion.
- Sector
- Public Sector
- Service
- Cost Planning
- Stage
- RIBA 3
The challenge
The design team needed a Stage 3 cost plan that could survive governance review and still support value-engineering workshops.
We produced an elemental plan with explicit assumptions, risk allowances, and two façade options costed side-by-side for the project board.
- Education
- Cost Planning
- Public Sector
Project Results
- Stage
- RIBA 3
- Options
- 2 façades
- Audience
- Project board